Page
2........... Environmental
Monitoring and Audit
3........... implementation
status on the environmental protection requirements
List
of Tables
Table 1.1 Summary of Awarded Works Contracts
Table 2.1 Summary of Major Construction Activities in the
Reporting Period
Table 2.2 Summary of 1-Hour TSP Monitoring Results in the Reporting Period
Table 2.3 Summary of Construction Noise Monitoring Results in the
Reporting Period
Table 3.1 Summary of EP Submissions Status
List of Appendices
Appendix A Monthly
EM&A Report for July 2023 ¡V Contract 1201 Tung Chung West Station and
Tunnels
Table 1.1 Summary of Awarded Works Contracts
|
Works Contract |
Description |
Construction
Start Date |
Contractor |
Environmental
Team |
|
1201 |
Tung Chung West Station and Tunnels |
June 2023 |
Bouygues ¡V Dragages (1201) JV |
AECOM Asia Co. Ltd. |
|
1202 |
Tung Chung East Station and Associated
Enabling Works for Track Diversions |
July 2023 |
Paul Y. ¡V CRCC (TUE1202) JV |
Acuity Sustainability Consulting Limited |
Table 2.1 Summary
of Major Construction Activities in the Reporting Period
|
Works Contract |
Site |
Construction Activities |
|
1201 |
Tung Chung West
(TCW) Area |
¡P
Site clearance at Yu
Tung Road and transplantation ¡P
Construction of
covered walkway for footbridge ramp demolition at Yu Tung Road ¡P
Site clearance, site
formation and ground investigation at TCW ¡P
Preparation for site
office setup |
|
Tung Chung
Cresecent (TCC) and Tung Chung Ancillary Building (TCA) Areas |
¡P
Site clearance at TCC
area ¡P
Site preparation at
TCA area |
|
|
Barging
Facility Area |
¡P Site preparation |
|
|
1202 |
Tung Chung East (TCE) Area |
¡P
Site
preparation ¡P
Site
clearance ¡P
Preparation
for site office setup |
|
Area 138 |
¡P
Site
preparation |
Table 2.2 Summary
of 1-Hour TSP Monitoring Results in the Reporting Period
|
Monitoring Station ID |
Location |
TSP Concentration
(µg/m3) |
Action Level (µg/m3) |
Limit Level (µg/m3) |
Exceedance due to the Project Construction (Yes/No) |
|
Works Contract 1201 |
|||||
|
DM-2 |
Sheraton Hong Kong Tung Chung Hotel Shopping Mall |
N/A(1) |
326 |
500 |
No |
|
DM-3 |
Shops at Tung Chung Crescent |
N/A(1) |
327 |
500 |
No |
|
DM-4 |
Yat Tung Shopping Centre |
23.8 ¡V 127.8 |
312 |
500 |
No |
|
DM-5b(2) |
Ma
Wan Chung Village |
24.4 ¡V 133.4 |
333 |
500 |
No |
|
Works Contract 1202 |
|||||
|
DM-1b(3) |
G/F
of Ying Yuet House |
22.2 ¡V 177.3 |
327 |
500 |
No |
|
DM-1a |
TCNTE East - Planned Commercial Development (COM-1/Area 57) |
N/A(1) |
342 |
500 |
No |
Note:
(1)
Imapct monitoring to be carried out during the
construction period of corresponding activity
(2)
Alternative monitoring location to DM-5 Ma Wan
Chung Vilage in the approved EM&A Mnaual
(3)
Alternative monitoring location to DM-1 Rosita Yuen
Kindergarten in the appvoed EM&A Manual
Table 2.3 Summary
of Construction Noise Monitoring Results in the Reporting Period
|
Monitoring Station ID |
Location |
Noise Level (LAeq,30mins, dB(A)) |
Limit Level (dB(A)) |
Exceedance due to the Project Construction (Yes/No) |
|
Works Contract 1201 |
||||
|
NM2 |
Tung Chung Crescent |
N/A(1) |
75 |
No |
|
NM3a(3) |
2/F rooftop of Yat Tung Shoppgin Centre |
50.5 ¡V 52.4 |
75 |
No |
|
Works Contract 1202 |
||||
|
NM1 |
Ying Tung Estate |
Below baseline level ¡V 58.6 |
75 |
No |
|
NM4 |
Tung Chung Area 113 |
N/A(2) |
75 |
No |
|
NM6 |
Tung Chung Area 100 |
N/A(2) |
75 |
No |
Note:
(1)
Impact noise monitoring to be carried out during the
construction period of the corresponding activity
(2)
Impact noise monitoring to be carried out upon the
intake of the population and during the construction period of the
corresponding activity
(3)
Alternative monitoring location to NM3 Yat Tung
Estate in approved EM&A Manual
Table 2.4 Log
for Environmental Complaints, Notification of Summons and Successful
Prosecutions for the Reporting Month
|
Works Contract |
Environmental Complaints |
Notification of Summons |
Successful Prosecutions |
|
1201 |
0 |
0 |
0 |
|
1202 |
0 |
0 |
0 |
Table 3.1 Summary
of EP Submissions Status
|
EP Condition (EP-614/2022) |
Submission |
Submission date |
|
Condition 1.12 |
Notification of
Commencement Date of Construction |
9
Mar 2023 9
May 2023 (update) |
|
Condition 1.14 |
Notification of
Commencement Date of Operation |
No
later than 1 month prior to the commencement of operation |
|
Condition 2.9 |
Notification of Setup of Community Liaison
Group |
21
Mar 2023 |
|
Condition 2.10 |
Construction Works Phasing
Schedule |
14
Apr 2023 |
|
Condition 2.11 |
EP Submission Schedule |
14
Apr 2023 |
|
Condition 2.12 |
Management Organization |
28
Apr 2023 |
|
Condition 2.13 |
Construction Noise Management
Plan (CNMP) ¡P
Works Contract No. 1201 ¡P
Works Contract No. 1202 |
10
Mar 2023 31
May 2023 (Approval) 10
Mar 2023 30
Jun 2023 (Approval) |
|
Condition 2.14 |
Rail Noise Mitigation Plan
(RNMP) |
13
Jan 2023 |
|
Condition 2.15 |
Plan on Noise Enclsoure at
Tung Chung Crescent |
13
Apr 2023 |
|
Condition 2.17 |
Landscape and Visual
Mitigatin Plan (LVMP) |
12
Apr 2023 |
|
Condition 2.18 |
Contingency and Response
Plan |
To
be submitted at least 2 months before the commencement of relevant part of
the construction works |
|
Condition 2.19 |
Wastewater Management Plan
(WWMP) |
9
Mar 2023 31
May 2023 (Approval) |
|
Condition 2.20 |
Waste Management Plan
(WMP) |
16
Feb 2023 |
|
Condition 2.23 |
Futher Archaeological
Testing Report |
28
Sep 2022 |
|
Condition 2.25 |
Fixed Plant Noise Audit
Report |
To
be submitted at least 1 month before commencement of operation of the Project |
|
Condition 3.3 |
Baseline Monitoring Report |
28
Apr 2023 |
|
Condition 3.4 |
Monthly EM&A Report
No.1 Monthly EM&A Report
No.2 |
14
July 2023 This
submission |
|
Condition 4.2 |
Dedicated Internet Website |
10
Jul 2023 |
Appendix A
Monthly EM&A Report
for
Contract
1201
Tung
Chung West Station and Tunnels
(July
2023)
Appendix B
Monthly EM&A Report
for
Contract
1202
Tung
Chung East Station and Associated Enabling Works for Track Diversions
(July
2023)