Project Background
The Siu Ho Wan Depot (SHD) Property Development is envisaged as a multi-phases scheme to reconfigure the existing Depot and construct a roof deck above the Depot for topside development including foundation and structure, with associated building services and E&M systems and enabling works for depot migration and topside development.
A new above ground station with side platforms alongside the live running track of Tung Chung Line (TCL) is required. The Oyster Bay Station (OYB), formerly named as Siu Ho Wan Station (SHO), is to serve the future Siu Ho Wan topside development and the wider population within the nearby reclamation area development.
This dedicated website is prepared in accordance with the requirements in the Environmental Permit (EP)(EP No. EP-588/2021) and is intended to enable public access to the project information including environmental monitoring data and submissions for the Project.

Disclaimer:
All drawings and visuals are provided for concept illustration only, and the content is subject to change.